
Nicole came over to help paint stall doors on Saturday. On Sunday I volunteered at a local eventing facility for their "Oktoberfest" competition. It was a long and stressful day of judging. Justin installed the hydrants for the wash stall and in the courtyard outside the stalls. Then he dug out the drain for the wash stall and installed the water line for the hot water heater. The Amish then came by after an absence of almost two weeks and prepped the back section of the barn for concrete.

No comments:
Post a Comment